Questions? Comments?send e-mail
finished water feature
beginning construction-excavated hole needing to be pumped
pumped out and dry during construction-laying out the liner
laying out the base for steps and wall
setting the first stone
setting the base for the steps and wall
base for steps and perimeter wall
water control gate attatched to liner ready to set
water feature at completion
water control gate shop drawing
water controlgate drawing installation section
[Home] [Landscape Project Portfolio] [Links] [Contact Us]
© Providence Design North Salem, NY 914.485.1078